Gongda Innovation exports steel structures.

  Inspection markings for forced-draft cooling towers:
  1. Raw materials and purchased components must be sourced from domestic brands and manufacturers. The manufacturer (or supplier) shall provide material certificates, technical specifications, and quality inspection reports. 2. FRP products shall be manufactured in strict accordance with the company’s “Internal Control Standards for Draft‑Type Cooling Towers” and inspected and accepted in compliance with HG/T 20696–1999 and the relevant provisions stipulated in the associated technical documentation.
  3. Installation and fan commissioning: Perform all operations and acceptance procedures in strict accordance with the contents of our company’s “CXGB Series Forced-Draft FRP Cooling Tower User Manual,” the “Internal Control Standards for Forced-Draft Cooling Towers,” and the company’s installation specifications.
  4. All products (including externally purchased fans, plastic components, steel structures, bolts, and associated installation materials) must be accompanied by a shipping manifest upon leaving the factory.
  5. Provide the fan and gearbox required by Party A, along with the packing list, quality inspection report, this company’s “CXGB Series Blower-Type FRP Cooling Tower User Manual,” the product certificate of conformity, and material certificates for the relevant components.
 
 